The Outer Shell: Insulating
To keep heating and cooling costs lower, we must minimize “thermal bridges” between the outer shell and the inside of the building. We glued and taped insulation inside the footprint of the foundation before the concrete slab was poured. Later, after the forms were removed, we glued more around the sides of the slab.